National Maglev initiative: California line electric utility power system requirementsThe electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.
Document ID
19940031343
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Save, Phil
(Southern California Edison Co. Rosemead, CA, United States)
Date Acquired
September 6, 2013
Publication Date
May 1, 1994
Publication Information
Publication: NASA. Langley Research Center, Second International Symposium on Magnetic Suspension Technology, Part 1
Subject Category
Electronics And Electrical Engineering
Accession Number
94N35850
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available