NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Refurbishment of a 39 foot thermal vacuum chamberThe 39' thermal vacuum chamber at Space Systems/Loral has been used to test numerous spacecraft including those of the GOES, Intelsat, Insat, Superbird, N-Star, NATO and other programs. Ten years ago, the aluminum LN2 shroud experienced serious fatigue failures in the field welded jumper tubing, effectively shutting down the chamber for vacuum testing. The problem was repaired at the time, but new failures began to reappear a few months ago and are now occurring at a rate that suggests that the shroud may again become inoperable. Consequently, Space Systems/Loral is spending in excess of $6 million to replace the shroud and the existing LN2 equipment with a new, state of the art cryogenic system. In May, 1994, a contract was awarded to remove the existing shroud and LN2 pumping system and replace it with a gravity fed shroud and distribution system. Included in the contract are eight skid mounted gaseous nitrogen pumping systems capable of controlling shroud zone temperatures between +150 C and -180 C. The project is scheduled to be completed in April 1995.
Document ID
19950007672
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Edwards, Arthur A.
(Space Systems/Loral Palo Alto, CA, United States)
Date Acquired
September 6, 2013
Publication Date
November 1, 1994
Publication Information
Publication: NASA. Goddard Space Flight Center, Eighteenth Space Simulation Conference: Space Mission Success Through Testing
Subject Category
Ground Support Systems And Facilities (Space)
Accession Number
95N14085
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available