NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
Milestone 4: Test plan for Reusable Hydrogen Composite Tank System (RHCTS). Task 3: Composite tank materialsThis document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.
Document ID
19950008387
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Greenberg, H. S.
(Rockwell International Corp. Downey, CA, United States)
Date Acquired
September 6, 2013
Publication Date
November 4, 1994
Subject Category
Composite Materials
Report/Patent Number
NASA-CR-197036
SD94D0329
NAS 1.26:197036
Report Number: NASA-CR-197036
Report Number: SD94D0329
Report Number: NAS 1.26:197036
Accession Number
95N14801
Funding Number(s)
CONTRACT_GRANT: NCC8-39
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available