NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Space Station Freedom primary power wiring requirementsThe Space Station Freedom (SSF) Program requirements are a 30 year reliable service life in low Earth orbit in hard vacuum or pressurized module service without detrimental degradation. Specific requirements are outlined in this presentation for SSF primary power and cable insulation. The primary power cable status and the WP-4 planned cable test program are also reviewed along with Rocketdyne-WP04 prime insulation candidates.
Document ID
19950009636
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Hill, Thomas J.
(NASA Lewis Research Center Cleveland, OH, United States)
Date Acquired
September 6, 2013
Publication Date
September 1, 1994
Publication Information
Publication: First NASA Workshop on Wiring for Space Applications
Subject Category
Spacecraft Propulsion And Power
Accession Number
95N16051
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available