SXI prototype mirror mountThe purpose of this contract was to provide optomechanical engineering and fabrication support to the Solar X-ray Imager (SXI) program in the areas of mirror, optical bench and camera assemblies of the telescope. The Center for Applied Optics (CAO) worked closely with the Optics and S&E technical staff of MSFC to develop and investigate the most viable and economical options for the design and fabrication of a number of parts for the various telescope assemblies. All the tasks under this delivery order have been successfully completed within budget and schedule. A number of development hardware parts have been designed and fabricated jointly by MSFC and UAH for the engineering model of SXI. The major parts include a nickel electroformed mirror and a mirror mount, plating and coating of the ceramic spacers, and gold plating of the contact rings and fingers for the camera assembly. An aluminum model of the high accuracy sun sensor (HASS) was also designed and fabricated. A number of fiber optic tapers for the camera assembly were also coated with indium tin oxide and phosphor for testing and evaluation by MSFC. A large number of the SXI optical bench parts were also redesigned and simplified for a prototype telescope. These parts include the forward and rear support flanges, front aperture plate, the graphite epoxy optical bench and a test fixture for the prototype telescope. More than fifty (50) drawings were generated for various components of the prototype telescope. Some of these parts were subsequently fabricated at UAH machine shop or at MSFC or by the outside contractors. UAH also provide technical support to MSFC staff for a number of preliminary and critical design reviews. These design reviews included PDR and CDR for the mirror assembly by United Technologies Optical Systems (UTOS), and the program quarterly reviews, and SXI PDR and CDR. UAH staff also regularly attended the monthly status reviews, and made a significant number of suggestions to improve the design, assembly and alignment of the telescope. Finally, a high level assembly and alignment plan for the entire telescope was prepared by UAH. This plan addresses the sequence of assembly, the required assembly and alignment tolerances, and the methods to verify the alignment at each step during the assembly process. This assembly and alignment plan will be used to assemble and integrate the engineering model (EM) of the telescope. Later on, based on this plan more detailed assembly and alignment procedures will be developed for the lower-level assemblies of SXI.
Document ID
19960000974
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 6, 2013
Publication Date
April 1, 1995
Subject Category
Optics
Report/Patent Number
NASA-CR-199369
NAS 1.26:199369
Report Number: NASA-CR-199369
Report Number: NAS 1.26:199369
Accession Number
96N10974
Funding Number(s)
CONTRACT_GRANT: NAS8-38609