NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Shearographic non-destructive evaluation of space shuttle thermal protection systemsPreliminary results of shearographic inspections of the shuttle external tank (ET) spray-on foam insulation (SOFI) and solid rocket booster (SRB) Marshall sprayable ablative (MSA-2) epoxy-cork thermal protection systems (TPS) are presented. Debonding SOFI or MSA-2 damage the orbiter 'belly' tile and exposes the ET/SRB to thermal loading. Previous work with the ET/SRB showed promising results with shearography. The first area investigated was the jack pad close-out, one of many areas on the ET where foam is applied at KSC. Voids 0.375 inch were detected in 1.75 inch thick foam using a pressure reduction of less than 0.4 psi. Of primary interest are areas of the ET that directly face the orbiter tile TPS. It is estimated that 90% of tile TPS damage on the orbiter 'belly' results from debonding SOFI during ascent. Test panels modeling these areas were manufactured with programmed debonds to determine the sensitivity of shearography as a function of debond size, SOFI thickness and vacuum. Results show repeatable detection of debonds with a diameter approximately half the SOFI thickness at less than 0.4 psi pressure reduction. Preliminary results are also presented on inspections of MSA-2 and the remote manipulator system (RMS) honeycomb material
Document ID
19960029100
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Hooker, Jeffrey A.
(I-NET, Inc. Cocoa Beach, FL United States)
Simmons, Stephen M.
(I-NET, Inc. Cocoa Beach, FL United States)
Davis, Christopher K.
(NASA Cocoa Beach, FL United States)
Tenbusch, Kenneth E.
(NASA Cocoa Beach, FL United States)
Date Acquired
September 6, 2013
Publication Date
January 1, 1995
Subject Category
Space Transportation
Report/Patent Number
NASA-CR-201408
NAS 1.26:201408
Report Number: NASA-CR-201408
Report Number: NAS 1.26:201408
Meeting Information
Meeting: Conference on Non-destructive Evaluation of Aging Infrastructure
Location: Oakland, CA
Country: United States
Start Date: June 6, 1995
End Date: June 8, 1995
Accession Number
96N29643
Funding Number(s)
CONTRACT_GRANT: NAS10-11943
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available