NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
STS 62 Final ReportThe report is organized into sections representing the phases of work performed in analyzing the STS 62 results and preparing the instrument for STS 65. Section 2 contains a brief analysis of the STS 62 data which verifies the instrument changes to resolve the STS 58 problems. Section 3 describes the results from STS 62, including the original mission plan and several minor calibration period anomalies first discovered on STS 58 and reappearing to a lesser extent on STS 62.
Document ID
19970009848
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Authors
Rice, James E.
(Canopus Systems, Inc. Ann Arbor, MI United States)
Date Acquired
September 6, 2013
Publication Date
December 1, 1996
Subject Category
Spacecraft Propulsion And Power
Report/Patent Number
E-10559
OARE-TR-145
NAS 1.26:198551
NASA-CR-198551
Report Number: E-10559
Report Number: OARE-TR-145
Report Number: NAS 1.26:198551
Report Number: NASA-CR-198551
Accession Number
97N15216
Funding Number(s)
CONTRACT_GRANT: NAS3-26556
PROJECT: RTOP 963-60-0C
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available