NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
EOS-AM1 Nickel Hydrogen CellThis paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missile and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of die tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18,202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operating at +30 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements through the first 18,202 cycles, including: end of charge mid discharge cell voltages and voltage gradients; end of charge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11,998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery perfortnances as a funcfion of cycle life for both the real-time LEO and the accelerated life test regimes.
Document ID
19990008072
Acquisition Source
Goddard Space Flight Center
Document Type
Other
Authors
Bennett, Charles W.
(Lockheed Martin Missiles and Space Huntsville, AL United States)
Keys, Denney J.
(NASA Goddard Space Flight Center Greenbelt, MD United States)
Rao, Gopalakrishna M.
(NASA Goddard Space Flight Center Greenbelt, MD United States)
Wannemacher, Hari E.
(Jackson and Tull, Inc. Seabrook, MD United States)
Vaidyanathan, Harry
(Communications Satellite Corp. Clarksburg, MD United States)
Date Acquired
September 6, 2013
Publication Date
January 1, 1997
Subject Category
Energy Production And Conversion
Meeting Information
Meeting: Aerospace Battery
Location: Huntsville, AL
Country: United States
Start Date: January 1, 1997
Funding Number(s)
CONTRACT_GRANT: NAS5-32500
CONTRACT_GRANT: NAS5-32600
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available