EOS-AM1 Nickel Hydrogen Cell Interim Life Test ReportThis paper reports the interim results Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missiles and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of the tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64-minute charge (VT at 1,507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5 percent DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60 percent DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.90 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (minus 5 deg) cold plate. The entire assembly is located in a thermal chamber operating at plus 3 deg. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at plus 10 deg. The real-time LEO life test battery has met all performance requirements through the first 18,202 cycles, including: end of charge and discharge cell voltages and voltage gradients; end of charge and discharge cells pressures; within cell and between cell temperature gradients dischare capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery performances as a function of cycle life for both the real-time LEO and the accelerated life test regimes.
Document ID
19990017681
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Bennett, Charles W.
(Lockheed Martin Astro Space King of Prussia, PA United States)
Keys, D. J.
(NASA Goddard Space Flight Center Greenbelt, MD United States)
Rao, G. M.
(NASA Goddard Space Flight Center Greenbelt, MD United States)
Wannemacher, H. E.
(Jackson and Tull, Inc. Seabrook, MD United States)
Vaidyanathan, Hari
(Communications Satellite Corp. Clarksburg, MD United States)
Date Acquired
August 19, 2013
Publication Date
July 1, 1998
Publication Information
Publication: The 1997 NASA Aerospace Battery Workshop
Subject Category
Energy Production And Conversion
Funding Number(s)
CONTRACT_GRANT: NAS5-32500
CONTRACT_GRANT: NAS5-32600
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.