NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Genesis Trajectory DesignThe Genesis mission will launch in 2001, sending the spacecraft into a halo orbit about the Sun-Earth L1 point to collect and return solar wind samples to the Earth for analysis in 2003. One of the most constraining aspects of the mission design is the requirement to return to the designated landing site (the Utah Test and Training Range, UTTR) during daylight hours. The ongoing mission design has led the development of a family of solutions that characterize a broad range of conditions at Earth entry. Characterizing this family provides insight into the possible existence of additional trajectories while also helping to narrow the search space by indicating where additional solutions are unlikely to exist; this contributes to a more efficient utilization of mission design resources.
Document ID
20000057278
Acquisition Source
Headquarters
Document Type
Other
Authors
Bell, Julia L.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA United States)
Lo, Martin W.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA United States)
Wilson, Roby S.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA United States)
Date Acquired
September 7, 2013
Publication Date
January 1, 2000
Subject Category
Astronautics (General)
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available