NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Implementation of the WICS Wall Interference Correction System at the National Transonic FacilityThe Wall Interference Correction System (WICS) is operational at the National Transonic Facility (NTF) of NASA Langley Research Center (NASA LaRC) for semispan and full span tests in the solid wall (slots covered) configuration. The method is based on the wall pressure signature method for computing corrections to the measured parameters. It is an adaptation of the WICS code operational at the 12 ft pressure wind tunnel (12ft PWT) of NASA Ames Research Center (NASA ARC). This paper discusses the details of implementation of WICS at the NTF including tunnel calibration, code modifications for tunnel and support geometry, changes made for the NTF wall orifices layout, details of interfacing with the tunnel data processing system, and post-processing of results. Example results of applying WICS to a semispan test and a full span test are presented. Comparison with classical correction results and an analysis of uncertainty in the corrections are also given. As a special application of the code, the Mach number calibration data from a centerline pipe test was computed by WICS. Finally, future work for expanding the applicability of the code including online implementation is discussed.
Document ID
20000060821
Acquisition Source
Langley Research Center
Document Type
Preprint (Draft being sent to journal)
Authors
Iyer, Venkit
(Lockheed Martin Corp. Hampton, VA United States)
Everhart, Joel L.
(NASA Langley Research Center Hampton, VA United States)
Bir, Pamela J.
(Vigyan Research Associates, Inc. Hampton, VA United States)
Ulbrich, Norbert
(Sverdrup Technology, Inc. Moffett Field, CA United States)
Date Acquired
September 7, 2013
Publication Date
January 1, 2000
Subject Category
Research And Support Facilities (Air)
Report/Patent Number
AIAA Paper 2000-2383
Report Number: AIAA Paper 2000-2383
Meeting Information
Meeting: Measurement Technology and Ground Testing
Location: Denver, CO
Country: United States
Start Date: June 19, 2000
End Date: June 22, 2000
Sponsors: American Inst. of Aeronautics and Astronautics
Funding Number(s)
CONTRACT_GRANT: NAS1-96014
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available