NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Environmental Test Screening ProcedureThis procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.
Document ID
20000063497
Acquisition Source
Marshall Space Flight Center
Document Type
Other
Authors
Zeidler, Janet
(Kaiser Electro-Optics, Inc. West Carlsbad, CA United States)
Date Acquired
September 7, 2013
Publication Date
March 30, 2000
Subject Category
Optics
Funding Number(s)
CONTRACT_GRANT: NAS8-98236
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available