NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Strategies and Recommended Targets for Mars Surveyor Program Landing SitesThe two major constraints for selecting the Mars Surveyor Program (MSP) 2001 landing site at the time of this meeting are latitude (30'N to 15S) and elevation (< 2.5 km). The latitude belt will be narrowed down to a 15' sector after this workshop. This mission will demonstrate the capability to perform a precision landing, with the goal of achieving an accuracy of approximately 10 km, 3-sigma. There will be at least two different landing sites ('01 and '03) selected in the MSP. However, there should be an option of having the '05 sample return mission land in a different site and the '05 mission should be equipped with a rover for two reasons. The reasoning behind this follows: '05 lander/rover package should have the option of going to an independent site from either '01 or '03 because predecessor missions (orbital) may locate the "Ultimate Site"; '05 needs a rover to either: (A) explore and sample this "ultimate site" for sample return; (B) retrieve samples from '01 or '03 rovers, as a contingency, in case these rovers malfunction and cannot negotiate the trek back to the sample return vehicle.
Document ID
20000113014
Acquisition Source
Ames Research Center
Document Type
Conference Paper
Authors
Rice, James W., Jr.
(NASA Ames Research Center Moffett Field, CA United States)
Scott, David H.
(Geological Survey Flagstaff, AZ United States)
Date Acquired
August 19, 2013
Publication Date
January 1, 1998
Publication Information
Publication: Mars Surveyor 2001 Landing Site Workshop
Subject Category
Lunar And Planetary Science And Exploration
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
Document Inquiry

Available Downloads

There are no available downloads for this record.
No Preview Available