NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
STS-100 Flight Day 10 HighlightsOn this tenth day of the STS-100 mission, the computer problems that delayed tests on the Canadian robotic arm are discussed between the Atlantis and Mission Ground Control. The Canadian robotic arm is seen after it lifts Spacelab from the pallet on Atlantis and moves to meet the Space Shuttle's robotic arm as it 'hands over' Spacelab to the smaller robotic arm. The Canadian robotic arm with Spacelab are seen against a backdrop of Earth as the Space Shuttle and International Space Station pass to the northeast of Australia.
Document ID
20010047634
Acquisition Source
Johnson Space Center
Document Type
Video
Date Acquired
August 20, 2013
Publication Date
April 30, 2001
Subject Category
Space Transportation And Safety
Report/Patent Number
BRF-1428J
NONP-NASA-VT-2001061751
Report Number: BRF-1428J
Report Number: NONP-NASA-VT-2001061751
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available