NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Report on the Acceptance Test of the CRI Y-MP 8128, 10 February - 12 March 1990The NAS Numerical Aerodynamic Simulation Facility's HSP 2 computer system, a CRI Y-MP 832 SN #1002, underwent a major hardware upgrade in February of 1990. The 32 MWord, 6.3 ns mainframe component of the system was replaced with a 128 MWord, 6.0 ns CRI Y-MP 8128 mainframe, SN #1030. A 30 day Acceptance Test of the computer system was performed by the NAS RND HSP group from 08:00 February 10, 1990 to 08:00 March 12, 1990. Overall responsibility for the RND HSP Acceptance Test was assumed by Duane Carbon. The terms of the contract required that the SN #1030 achieve an effectiveness level of greater than or equal to ninety (90) percent for 30 consecutive days within a 60 day time frame. After the first thirty days, the effectiveness level of SN #1030 was 94.4 percent, hence the acceptance test was passed.
Document ID
20020051340
Acquisition Source
Ames Research Center
Document Type
Other
Authors
Carter, Russell
(Computer Sciences Corp. Moffett Field, CA United States)
Kutler, Paul
Date Acquired
September 7, 2013
Publication Date
January 1, 1998
Subject Category
Computer Operations And Hardware
Report/Patent Number
RND-90-002
Report Number: RND-90-002
Funding Number(s)
CONTRACT_GRANT: NAS2-12961
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available