NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Life Cycle Systems Engineering Approach to NASA's 2nd Generation Reusable Launch VehicleThe overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd- generation system by 2 orders of magnitude - equivalent to a crew risk of 1 -in- 10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. Given a candidate architecture that possesses credible physical processes and realistic technology assumptions, the next set of analyses address the system's functionality across the spread of operational scenarios characterized by the design reference missions. The safety/reliability and cost/economics associated with operating the system will also be modeled and analyzed to answer the questions "How safe is it?" and "How much will it cost to acquire and operate?" The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.
Document ID
20020092099
Acquisition Source
Marshall Space Flight Center
Document Type
Preprint (Draft being sent to journal)
Authors
Thomas, Dale
(NASA Marshall Space Flight Center Huntsville, AL United States)
Smith, Charles
(NASA Marshall Space Flight Center Huntsville, AL United States)
Safie, Fayssal
(NASA Marshall Space Flight Center Huntsville, AL United States)
Kittredge, Sheryl
(NASA Marshall Space Flight Center Huntsville, AL United States)
Date Acquired
September 7, 2013
Publication Date
January 1, 2002
Subject Category
Launch Vehicles And Launch Operations
Meeting Information
Meeting: Workshop on Life Cycle Systems Engineering
Location: Redstone Arsenal, AL
Country: United States
Start Date: November 6, 2002
End Date: November 7, 2002
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available