NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
The Clock Is TickingRecently, I worked on creating a one-of-a-kind device for a Space Station group studying exercise physiology at another NASA Center. They approached my department at Ames Research Center to design and build an exercise bed that allowed users to perform the motions that they needed for ground-based research. The real challenge was that they needed the device designed, built, and delivered in just one month. The bed was intended to simulate doing squats while in a horizontal position as if on a moving sled. They wanted to incorporate a resistant device called an Interim Resistive Exercise Device (IRED), an adjustable cable tied into a reel to provide a measured amount of resistance. This device was used on the Station for exercising in space; we were taking the same resistant reel and incorporating it in this bed. In the early stages of a design project, I communicate with a customer as much as I can and as often as they will tolerate. There s a lot of learning that needs to go on, and I prefer to spend a little bit of extra time here because that can save a lot of time later. In the beginning, you need to volley the information back-and-forth, so that you understand the customer s requirements and they know what you re capable of doing.
Document ID
20030106461
Acquisition Source
Headquarters
Document Type
Reprint (Version printed in journal)
Authors
Gundo, Dan
(NASA Ames Research Center Moffett Field, CA, United States)
Date Acquired
August 21, 2013
Publication Date
October 1, 2003
Publication Information
Publication: ASK Magazine, No. 14
Subject Category
Life Sciences (General)
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available