NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Requirements: The More the Better?Nothing ever, ever, becomes a requirement until two things happen: (1) there is a solid understanding and acceptance of the requirement's cost and schedule implications; and (2) knowledgeable technical people are so confident that the program can meet the requirement within the cost and schedule that they are willing to bet their jobs on it. Yikes!! Does this mean that we never undertake high-risk projects? No. what it does mean is that when you undertake high-risk activities, you agree on an expectation or requirement that includes failure, or falling short, as a real possibility, and your cost and schedule reflect the risk. The other thing that it means is that you may have to start a project with some requirements open until after the work progresses to a point where the requirement meets the two criteria above. The process is also flawed because there are usually too many requirements. Something about the engineering or designer mentality seems to demand hosts of requirements as an input to the technical process.
Document ID
20030106463
Acquisition Source
Headquarters
Document Type
Reprint (Version printed in journal)
Authors
Little, Terry
(Missile Defense Agency Washington, DC, United States)
Date Acquired
August 21, 2013
Publication Date
October 1, 2003
Publication Information
Publication: ASK Magazine, No. 14
Subject Category
Systems Analysis And Operations Research
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available