NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
TOPEX Radar Altimeter Engineering Assessment Report Update: Side B Turn-On to January 1, 2004This is the eleventh in a series of TOPEX Radar Engineering Assessment Reports, The initial TOPEX Radar Altimeter Engineering Assessment Report, in February 1994, presented performance results for the NASA Radar Altimeter on the TOPEX/POSEIDON spacecraft, from the time of its launch in August 1992 to February 1994. Since the time of that initial report and prior to this report, there have been nine interim supplemental Engineering Assessment Reports, issued in March 1995, May 1996, March 1997, June 1998, August 1999, September 2000, June 2001, March 2002 and again in May 2003.The sixth supplement in September 2000 was the first assessment report that addressed Side B performance, and presented the altimeter performance from the turn-on of Side B until the end of calendar year 1999. This report extends the performance assessment of Side B to the end of calendar year 2003 and includes the performance assessment of Jason-1, the TOPEX follow-on mission, launched on December 7, 2001.
Document ID
20040077332
Acquisition Source
Goddard Space Flight Center
Document Type
Technical Memorandum (TM)
Authors
Hancock, David W., III
(NASA Wallops Flight Center Wallops Island, VA, United States)
Lockwood, D. W.
(Raytheon Information Technology and Scientific Services Wallops Island, VA, United States)
Hayne, G. S.
(Raytheon Information Technology and Scientific Services Wallops Island, VA, United States)
Brooks, R. L.
(Raytheon Information Technology and Scientific Services Wallops Island, VA, United States)
Date Acquired
September 7, 2013
Publication Date
April 1, 2004
Subject Category
Instrumentation And Photography
Report/Patent Number
NASA/TM-2004-212236/VOL18
Rept-2004-01795-0/VOL18
Report Number: NASA/TM-2004-212236/VOL18
Report Number: Rept-2004-01795-0/VOL18
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available