NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
James Webb Space Telescope: Supporting Multiple Ground System Transitions in One YearIdeas, requirements, and concepts developed during the very early phases of the mission design often conflict with the reality of a situation once the prime contractors are awarded. This happened for the James Webb Space Telescope (JWST) as well. The high level requirement of a common real-time ground system for both the Integration and Test (I&T), as well as the Operation phase of the mission is meant to reduce the cost and time needed later in the mission development for re-certification of databases, command and control systems, scripts, display pages, etc. In the case of JWST, the early Phase A flight software development needed a real-time ground system and database prior to the spacecraft prime contractor being selected. To compound the situation, the very low level requirements for the real-time ground system were not well defined. These two situations caused the initial real-time ground system to be switched out for a system that was previously used by the Bight software development team. To meet the high-!evel requirement, a third ground system was selected based on the prime spacecraft contractor needs and JWST Project decisions. The JWST ground system team has responded to each of these changes successfully. The lessons learned from each transition have not only made each transition smoother, but have also resolved issues earlier in the mission development than what would normally occur.
Document ID
20040079802
Acquisition Source
Goddard Space Flight Center
Document Type
Preprint (Draft being sent to journal)
Authors
Detter, Ryan
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Fatig, Curtis
(Science Applications International Corp. Greenbelt, MD, United States)
Steck, Jane
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
September 7, 2013
Publication Date
January 1, 2004
Subject Category
Computer Programming And Software
Meeting Information
Meeting: SPIE Conference
Location: Glasgow, Scotland
Country: United Kingdom
Start Date: June 19, 2004
End Date: June 26, 2004
Sponsors: International Society for Optical Engineering
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available