NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
JSC Metal Finishing Waste Minimization MethodsTHe paper discusses the following: Johnson Space Center (JSC) has achieved VPP Star status and is ISO 9001 compliant. The Structural Engineering Division in the Engineering Directorate is responsible for operating the metal finishing facility at JSC. The Engineering Directorate is responsible for $71.4 million of space flight hardware design, fabrication and testing. The JSC Metal Finishing Facility processes flight hardware to support the programs in particular schedule and mission critical flight hardware. The JSC Metal Finishing Facility is operated by Rothe Joint Venture. The Facility provides following processes: anodizing, alodining, passivation, and pickling. JSC Metal Finishing Facility completely rebuilt in 1998. Total cost of $366,000. All new tanks, electrical, plumbing, and ventilation installed. Designed to meet modern safety, environmental, and quality requirements. Designed to minimize contamination and provide the highest quality finishes.
Document ID
20040084004
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Sullivan, Erica
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
September 7, 2013
Publication Date
November 1, 2003
Publication Information
Publication: 5th Conference on Aerospace Materials, Processes, and Environmental Technology
Subject Category
Chemistry And Materials (General)
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available