Formalizing New Navigation Requirements for NASA's Space ShuttleWe describe a recent NASA-sponsored pilot project intended to gauge the effectiveness of using formal methods in Space Shuttle software requirements analysis. Several Change Requests (CRs) were selected as promising targets to demonstrate the utility of formal methods in this demanding application domain. A CR to add new navigation capabilities to the Shuttle, based on Global Positioning System (GPS) technology, is the focus of this industrial usage report. Portions of the GPS CR were modeled using the language of SRI's Prototype Verification System (PVS). During a limited analysis conducted on the formal specifications, numerous requirements issues were discovered. We present a summary of these encouraging results and conclusions we have drawn from the pilot project.
Document ID
20040110966
Acquisition Source
Langley Research Center
Document Type
Conference Paper
Authors
DiVito, Ben L. (Vigyan Research Associates, Inc. Hampton, VA, United States)