NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
High Resolution Doppler Imager FY 2001,2002,2003 Operations and Algorithm MaintenanceDuring the performance period of this grant HRDI (High Resolution Doppler Imager) operations remained nominal. The instrument has suffered no loss of scientific capability and operates whenever sufficient power is available. Generally, there are approximately 5-7 days per month when the power level is too low to permit observations. The daily latitude coverage for HRDI measurements in the mesosphere, lower thermosphere (MLT) region are shown.It shows that during the time of this grant, HRDI operations collected data at a rate comparable to that achieved during the UARS (Upper Atmosphere Research Satellite) prime mission (1991 -1995). Data collection emphasized MLT wind to support the validation efforts of the TIDI instrument on TIMED, therefore fulfilling one of the primary objectives of this phase of the UARS mission. Skinner et al., (2003) present a summary of the instrument performance during this period.
Document ID
20050082138
Acquisition Source
Headquarters
Document Type
Other
Authors
Skinner, Wilbert
(Michigan Univ. Ann Arbor, MI, United States)
Date Acquired
September 7, 2013
Publication Date
December 21, 2004
Subject Category
Spacecraft Instrumentation And Astrionics
Report/Patent Number
UM-F004652
Report Number: UM-F004652
Funding Number(s)
CONTRACT_GRANT: NAG5-10812
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available