NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Incremental Scheduling Engines: Cost Savings through AutomationAs humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.
Document ID
20050204033
Acquisition Source
Marshall Space Flight Center
Document Type
Preprint (Draft being sent to journal)
Authors
Jaap, John
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Phillips, Shaun
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
September 7, 2013
Publication Date
January 1, 2005
Subject Category
Economics And Cost Analysis
Meeting Information
Meeting: International Conference on Automated Planning and Scheduling
Location: Monterey, CA
Country: United States
Start Date: June 5, 2005
End Date: June 10, 2005
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available