NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Orbiter Processing OverviewFootage of orbiter processing is shown. The Space Shuttle Discovery Landing Operations, Rollback to Orbiter Processing Facility After Landing, Orbiter Processing Facility, Vehicle Assembly Building (VAB), Orbiter Rollover from the Orbiter Processing Facility to the VAB, Atlantis Orbiter Lift and Mate, Atlantis Rollout to Launch Pad 39, Payload Canister Door Opened and Payload Move into Payload Ground Handling Mechanism, Payload into Orbiter, Orbiter Payload Bay Door Closure, Launch Pad Processing at Launch Complex 39, Rotating Service Structure Rollback at Launch Pad, Discovery Lift-off and SRB separation is presented.
Document ID
20050210232
Acquisition Source
Kennedy Space Center
Document Type
Video
Date Acquired
August 23, 2013
Publication Date
January 25, 2005
Subject Category
Space Transportation And Safety
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available