NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Alternatives to Re-Planning: Methods for Plan Re-Evaluation at RuntimeCurrent planning algorithms have difficulty handling the complexity that is due to an increase in domain uncertainty, and especially in the case of multi-dimensional continuous spaces. Therefore, they produce plans that do not take into account numerous situations that can occur at runtime, such as faults or other changes in the planning domain itself. Thus there is a gap between the plan generation and the reality experienced at runtime. Here we present two methods that allow the plan conditionals to be revised w.r.t. uncertainty on the system as estimated at runtime.
Document ID
20050240158
Acquisition Source
Ames Research Center
Document Type
Preprint (Draft being sent to journal)
Authors
Benazera, Emmanuel
(Research Inst. for Advanced Computer Science Moffett Field, CA, United States)
Date Acquired
September 7, 2013
Publication Date
January 1, 2005
Subject Category
Mathematical And Computer Sciences (General)
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available