NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Fault-Detection Tool Has Companies 'Mining' Own BusinessA successful launching of NASA's Space Shuttle hinges heavily on the three Space Shuttle Main Engines (SSME) that power the orbiter. These critical components must be monitored in real time, with sensors, and compared against expected behaviors that could scrub a launch or, even worse, cause in- flight hazards. Since 1981, SSME faults have caused 23 scrubbed launches and 29 percent of total Space Shuttle downtime, according to a compilation of analysis reports. The most serious cases typically occur in the last few seconds before ignition; a launch scrub that late in the countdown usually means a period of investigation of a month or more. For example, during the launch attempt of STS-41D in 1984, an anomaly was detected in the number three engine, causing the mission to be scrubbed at T-4 seconds. This not only affected STS-41D, but forced the cancellation of another mission and caused a 2-month flight delay. In 2002, NASA s Kennedy Space Center, the Florida Institute of Technology, and Interface & Control Systems, Inc., worked together to attack this problem by creating a system that could automate the detection of mechanical failures in the SSMEs fuel control valves.
Document ID
20060022063
Acquisition Source
Headquarters
Document Type
Other
Date Acquired
September 7, 2013
Publication Date
January 1, 2005
Publication Information
Publication: Spinoff 2005
Subject Category
Man/System Technology And Life Support
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available