NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
NASA Crew and Cargo Launch Vehicle Development Approach Builds on Lessons from Past and Present MissionsThe United States (US) Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with new space transportation systems for missions to the Moon, Mars, and beyond. The Crew Exploration Vehicle (CEV) that the new human-rated Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station (ISS) Toward the end of the next decade, a heavy-lift Cargo Launch Vehicle (CaLV) will deliver the Earth Departure Stage (EDS) carrying the Lunar Surface Access Module (LSAM) to low-Earth orbit (LEO), where it will rendezvous with the CEV launched on the CLV and return astronauts to the Moon for the first time in over 30 years. This paper outlines how NASA is building these new space transportation systems on a foundation of legacy technical and management knowledge, using extensive experience gained from past and ongoing launch vehicle programs to maximize its design and development approach, with the objective of reducing total life cycle costs through operational efficiencies such as hardware commonality. For example, the CLV in-line configuration is composed of a 5-segment Reusable Solid Rocket Booster (RSRB), which is an upgrade of the current Space Shuttle 4- segment RSRB, and a new upper stage powered by the liquid oxygen/liquid hydrogen (LOX/LH2) J-2X engine, which is an evolution of the J-2 engine that powered the Apollo Program s Saturn V second and third stages in the 1960s and 1970s. The CaLV configuration consists of a propulsion system composed of two 5-segment RSRBs and a 33- foot core stage that will provide the LOX/LED needed for five commercially available RS-68 main engines. The J-2X also will power the EDS. The Exploration Launch Projects, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operations planning for these new space transportation systems. Utilizing a foundation of heritage hardware and management lessons learned mitigates both technical and programmatic risk. Project engineers and managers work closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch systems, leveraging a wealth of knowledge from Shuffle operations. In addition, NASA and its industry partners have tapped into valuable Apollo databases and are applying corporate wisdom conveyed firsthand by Apollo-era veterans of America s original Moon missions. Learning from its successes and failures, NASA employs rigorous systems engineering and systems management processes and principles in a disciplined, integrated fashion to further improve the probability of mission success.
Document ID
20060025543
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Dumbacher, Daniel L.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
September 7, 2013
Publication Date
January 1, 2006
Subject Category
Spacecraft Design, Testing And Performance
Meeting Information
Meeting: AIAA SpaceOps 2006
Location: Rome
Country: Italy
Start Date: June 19, 2006
End Date: June 23, 2006
Sponsors: American Inst. of Aeronautics and Astronautics
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available