NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Building Operations Efficiencies into NASA's Crew Launch Vehicle DesignThe U.S. Vision for Space Exploration guides NASA's challenging missions of technological innovation and scientific investigation. With the Agency's commitment to complete the International Space Station (ISS) and to retire the Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in mid 2005 to analyze options for a safer, simpler, more cost efficient launch system that could deliver timely human-rated space transportation capabilities. NASA's finite resources yield discoveries with infinite possibilities. As the Agency begins the process of replacing the Shuttle with new launch vehicles destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo systems for maximum operational efficiencies. This mandate is imperative to reduce the $4.5 billion NASA spends on space transportation each year. This paper gives top-level details of how the follow-on Crew Launch Vehicle (CLV) is being designed for reduced lifecycle costs as a primary catalyst for the expansion of future frontiers.
Document ID
20070001985
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Dumbacher, Daniel L.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
August 24, 2013
Publication Date
January 1, 2006
Subject Category
Launch Vehicles And Launch Operations
Meeting Information
Meeting: AIAA Space 2006
Location: San Jose, CA
Country: United States
Start Date: September 19, 2006
End Date: September 21, 2006
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available