NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Requirements and Techniques for Developing and Measuring Simulant MaterialsThe 1989 workshop report entitled Workshop on Production and Uses of Simulated Lunar Materials and the Lunar Regolith Simulant Materials: Recommendations for Standardization, Production, and Usage, NASA Technical Publication identify and reinforced a need for a set of standards and requirements for the production and usage of the lunar simulant materials. As NASA need prepares to return to the moon, a set of requirements have been developed for simulant materials and methods to produce and measure those simulants have been defined. Addressed in the requirements document are: 1) a method for evaluating the quality of any simulant of a regolith, 2) the minimum Characteristics for simulants of lunar regolith, and 3) a method to produce lunar regolith simulants needed for NASA's exploration mission. A method to evaluate new and current simulants has also been rigorously defined through the mathematics of Figures of Merit (FoM), a concept new to simulant development. A single FoM is conceptually an algorithm defining a single characteristic of a simulant and provides a clear comparison of that characteristic for both the simulant and a reference material. Included as an intrinsic part of the algorithm is a minimum acceptable performance for the characteristic of interest. The algorithms for the FoM for Standard Lunar Regolith Simulants are also explicitly keyed to a recommended method to make lunar simulants.
Document ID
20070002820
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Rickman, Doug
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Owens, Charles
(Teledyne Brown Engineering Huntsville, AL, United States)
Howard, Rick
(Teledyne Brown Engineering Huntsville, AL, United States)
Date Acquired
August 24, 2013
Publication Date
January 1, 2006
Subject Category
Solar Physics
Meeting Information
Meeting: Space Resources Roundtable VIII
Location: Golden, CO
Country: United States
Start Date: October 31, 2006
End Date: November 2, 2006
Funding Number(s)
CONTRACT_GRANT: NCC8-200
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available