NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Advanced Docking Berthing System UpdateIn FY05 the Exploration Systems Technology Maturation Program selected the JSC advanced mating systems development to continue as an in-house project. In FY06, as a result of ESAS Study (60 Day Study) the CEV Project (within the Constellation Program) has chosen to continue the project as a GFE Flight Hardware development effort. New requirement for CEV to travel and dock with the ISS in 2011/12 in support of retiring the Shuttle and reducing the gap of time where US does not have any US based crew launch capability. As before, long-duration compatible seal-on-seal technology (seal-on-seal to support androgynous interface) has been identified as a risk mitigation item.
Document ID
20070002995
Acquisition Source
Glenn Research Center
Document Type
Conference Paper
Authors
Lewis, James
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
August 24, 2013
Publication Date
October 1, 2006
Publication Information
Publication: 2005 NASA Seal/Secondary Air System Workshop, Volume 1
Subject Category
Space Transportation And Safety
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available