NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
2nd ISS Treadmill Development "T2 Project"An overview of the development of a treadmill for the International Space Station is presented. Topics discussed include: flight certification of a Commercial Off the Shelf (COTS) Woodway Path treadmill; development and certificaiton of a crew interface to optimize use of the COTS design and/or existing NASA design (such as the ARED Pacebook); development and certification of a power supply to provide power from the ISS Vehicle to the treadmill system (crew interfaces, motor, controller and subject loading devices).
Document ID
20070011772
Acquisition Source
Johnson Space Center
Document Type
Conference Paper
Authors
MacNeill, Kevin
(NASA Johnson Space Center Houston, TX, United States)
Wiederhoeft, Curt
(Wyle Labs. United States)
Date Acquired
August 23, 2013
Publication Date
March 7, 2007
Subject Category
Man/System Technology And Life Support
Meeting Information
Meeting: 3rd Bi-annual Countermeasures Summit
Location: Houston, TX
Country: United States
Start Date: March 5, 2007
End Date: March 9, 2007
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available