A Contingency in the Rosetta Reaction Control System: Alternative Cruise Trajectory Strategies to Cope with Degraded Delta-V ResourcesSince August 2006 a pressure transducer of the Rosetta Reaction Control System (RCS) shows anomalous telemetries indicating a possible leak in a pressurant line. The future operation mode of the RCS may be affected by this problem, resulting in performance degradation. The current propellant budget and its future evolution are evaluated to show the possible states w.r.t. the required mission delta-V. Alternative cruise trajectory strategies are analyzed, providing delta-V savings, to compensate for the expected performance loss of the RCS.