A Contingency in the Rosetta Reaction Control System: Alternative Cruise Trajectory Strategies to Cope with Degraded Delta-V ResourcesSince August 2006 a pressure transducer of the Rosetta Reaction Control System (RCS) shows anomalous telemetries indicating a possible leak in a pressurant line. The future operation mode of the RCS may be affected by this problem, resulting in performance degradation. The current propellant budget and its future evolution are evaluated to show the possible states w.r.t. the required mission delta-V. Alternative cruise trajectory strategies are analyzed, providing delta-V savings, to compensate for the expected performance loss of the RCS.
Document ID
20080012699
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Bauske, Rainer
(TERMA G.m.b.H. Darmstadt, Germany)
Companys, Vincente
(European Space Agency. European Space Operations Center Darmstadt, Germany)
Date Acquired
August 24, 2013
Publication Date
September 24, 2007
Publication Information
Publication: Proceedings of the 20th International Symposium on Space Flight Dynamics
Subject Category
Avionics And Aircraft Instrumentation
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available