NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Technical Progress on the Ares I-X Flight TestAres I-X will be NASA's first test flight for a new human-rated launch vehicle since 1981, and the team is well on its way toward completing the vehicle's design and hardware fabrication for an April 2009 launch. This uncrewed suborbital development test flight gives NASA its first opportunities to: gather critical data about the flight dynamics of the integrated launch vehicle; understand how to control its roll during flight; better characterize the stage separation environments during future flight; and demonstrate the first stage recovery system. The Ares I-X Flight Test Vehicle (FTV) incorporates a mix of flight and mockup hardware. It is powered by a four-segment solid rocket booster, and will be modified to include a fifth, spacer segment; the upper stage, Orion crew exploration vehicle, and launch abort system are simulator hardware to make the FTV aerodynamically similar to the same size, shape, and weight of Ares I. The Ares IX first stage includes an existing Shuttle solid rocket motor and thrust vector control system controlled by an Ascent Thrust Vector Controller (ATVC) designed and built by Honeywell International. The avionics system will be tested in a dedicated System Integration Laboratory located at Lockheed Martin Space Systems (LMSS) in Denver, Colorado. The Upper Stage Simulator (USS) is made up of cylindrical segments that will be stacked and integrated at Kennedy Space Center (KSC) for launch. Glenn Research Center is already building these segments, along with their internal access structures. The active Roll Control System (RoCS) includes two thruster units harvested from Peacekeeper missiles. Duty cycle testing for RoCS was conducted, and fuel tanking and detanking tests will occur at KSC in early 2008. This important flight will provide valuable experience for the ground operations team in integrating, stacking, and launching Ares I. Data from Ares I-X will ensure the safety and reliability of America's newest launch vehicle.
Document ID
20080031492
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Davis, S.R.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Robinson, K.F.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Flynn, K.C.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
August 24, 2013
Publication Date
May 12, 2008
Subject Category
Launch Vehicles And Launch Operations
Meeting Information
Meeting: Joint Army-Navy-NASA-Air Force (JANNAF)Conference
Location: Massachusetts
Country: United States
Start Date: May 12, 2008
End Date: May 16, 2008
Sponsors: NASA Headquarters, Department of the Army, Department of the Navy, Department of the Air Force
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available