Constellation Program Life-cycle Cost Analysis Model (LCAM)The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.
Document ID
20080031533
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Prince, Andy
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Rose, Heidi
Wood, James
Date Acquired
August 24, 2013
Publication Date
May 12, 2008
Subject Category
Lunar And Planetary Science And Exploration
Meeting Information
Meeting: ISPA/SCEA 2008 Joint Annual Conference
Location: Nordwijk
Country: Netherlands
Start Date: May 12, 2008
End Date: May 14, 2008
Sponsors: European Space Agency. Centre Spatial de Toulouse
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available