NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
The Planning and Implementation of Test Facility ImprovementsAs engineering programs develop, and product testing begins, ideas for process improvement soon become obvious. Engineers envision new holding and handling fixtures. Additional custom-made support equipment may be needed. Perhaps modifications to the building or modifications to facility hardware are the order of the day. This is where a flexible creative test organization is needed. We need not be content with the status quo. All of these desired test innovations can make the difficult easy and improve the work flow. At times, implementing these new ideas demands more time or specialized expertise than test team members have. Through the coordinated use of labor resources, the needed improvements can still be made and in a timely fashion that supports program schedules. This presentation provides practical advice and a method whereby test personnel can creatively develop facility improvements and manage them from start to finish. You can control just how much time you invest and what part of your concepts you will personally design. By wisely defining the requirements and presenting them to the appropriate help sources (vendors, contractors, coworkers, and support departments), you can get the help you need to bring the improvements you have conceived, into fruition. Aspects of this presentation include defining requirements for test facility improvements, choosing labor resources, writing a statement of work, determining cost and benefits, securing department approval, coordinating procurement, managing the project, and training the end users. The process of successfully implementing test facility improvements is thoroughly explained. It has been tried, proven and improved over nearly 25 years of use. Whether considering a $50 improvement or a $50 million dollar improvement, this discussion will provide helpful pointers. Examples of improvements made through this process and their illustration will be included.
Document ID
20090015863
Acquisition Source
Goddard Space Flight Center
Document Type
Abstract
Authors
Oberlander, Larry
(Northrop Grumman Systems and Software Engineering Support United States)
Date Acquired
August 24, 2013
Publication Date
September 22, 2008
Publication Information
Publication: 25th Space Simulation Conference. Environmental Testing: The Earth-Space Connection
Subject Category
Space Sciences (General)
Distribution Limits
Public
Copyright
Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available