NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Managing Complexity - Developing the Node Control Software For The International Space StationOn December 4th, 1998 at 3:36 AM STS-88 (the space shuttle Endeavor) was launched with the "Node 1 Unity Module" in its payload bay. After working on the Space Station program for a very long time, that launch was one of the most beautiful sights I had ever seen! As the Shuttle proceeded to rendezvous with the Russian American module know as Zarya, I returned to Houston quickly to start monitoring the activation of the software I had spent the last 3 years working on. The FGB module (also known as "Zarya"), was grappled by the shuttle robotic arm, and connected to the Unity module. Crewmembers then hooked up the power and data connections between Zarya and Unity. On December 7th, 1998 at 9:49 PM CST the Node Control Software was activated. On December 15th, 1998, the Node-l/Zarya "cornerstone" of the International Space Station was left on-orbit. The Node Control Software (NCS) is the first software flown by NASA for the International Space Station (ISS). The ISS Program is considered the most complex international engineering effort ever undertaken. At last count some 18 countries are active partners in this global venture. NCS has performed all of its intended functions on orbit, over 200 miles above us. I'll be describing how we built the NCS software.
Document ID
20100033623
Acquisition Source
Johnson Space Center
Document Type
Preprint (Draft being sent to journal)
Authors
Wood, Donald B.
(Boeing Co. Houston, TX, United States)
Date Acquired
August 25, 2013
Publication Date
January 1, 2000
Subject Category
Computer Programming And Software
Report/Patent Number
JSC-CN-6171
Report Number: JSC-CN-6171
Funding Number(s)
CONTRACT_GRANT: NAS5-0000
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available