Architecture in Mission Integration, Choreographing ConstraintsIn any building project the Architect's role and skill is to balance the client's requirements with the available technology, a site and budget. Time, place and resources set the boundaries and constraints of the project. If these boundaries are correctly understood and respected by the Architect they can be choreographed into producing a facility that abides by those constraints and successfully meets the clients needs. The design and assembly of large scale space facilities whether in orbit around or on the surface of a planet require and employs these same skills. In this case the site is the International Space Station (ISS) which operates at a nominal rendezvous altitude of 220 nautical miles. With supplies to support a 7 day mission the Shuttle nominally has a cargo capacity of 35,000 pounds to that altitude. Through the Mission Integration process the Launch Package Management Team choreographs the constraints of ascent performance, hardware design, cargo, rendezvous, mission duration and assembly time in order to meet the mission objective.
Document ID
20100036848
Acquisition Source
Johnson Space Center
Document Type
Abstract
Authors
Jones, Rod
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
August 25, 2013
Publication Date
April 26, 2000
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
JSC-CN-6197
Report Number: JSC-CN-6197
Meeting Information
Meeting: 30th International Conference on Environmental Systems
Location: Toulouse, France
Country: France
Start Date: July 11, 2000
End Date: July 13, 2000
Sponsors: Society of Automotive Engineers, Inc.
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available