NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Applied Meteorology Unit (AMU)This report summarizes the Applied Meteorology Unit (AMU) activities for the first quarter of Fiscal Year 2010 (October - December 2009). A detailed project schedule is included in the Appendix. Included tasks are: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool, Phase III, (3) Peak Wind Tool for General Forecasting, Phase II, (4) Upgrade Summer Severe Weather Tool in Meteorological Interactive Data Display System (MIDDS), (5) Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS) Update and Maintainability, (5) Verify 12-km resolution North American Model (MesoNAM) Performance, and (5) Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) Graphical User Interface.
Document ID
20100039813
Acquisition Source
Kennedy Space Center
Document Type
Contractor or Grantee Report
Authors
Bauman, William
(ENSCO, Inc. Cocoa Beach, FL, United States)
Crawford, Winifred
(ENSCO, Inc. Cocoa Beach, FL, United States)
Barrett, Joe
(ENSCO, Inc. Cocoa Beach, FL, United States)
Watson, Leela
(ENSCO, Inc. Cocoa Beach, FL, United States)
Wheeler, Mark
(ENSCO, Inc. Cocoa Beach, FL, United States)
Date Acquired
August 25, 2013
Publication Date
January 31, 2010
Subject Category
Meteorology And Climatology
Report/Patent Number
KSC-2010-025
Report Number: KSC-2010-025
Funding Number(s)
CONTRACT_GRANT: NNK06MA70C
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available