NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Shuttle ProcessingThis slide presentation details shuttle processing flow which starts with wheel stop and ends with launching. The flow is from landing the orbiter is rolled into the Orbiter Processing Facility (OPF), where processing is performed, it is then rolled over to the Vehicle Assembly Building (VAB) where it is mated with the propellant tanks, and payloads are installed. A different flow is detailed if the weather at Kennedy Space Center requires a landing at Dryden.
Document ID
20110003619
Acquisition Source
Kennedy Space Center
Document Type
Presentation
Authors
Guodace, Kimberly A.
(United Space Alliance Houston, TX, United States)
Date Acquired
August 25, 2013
Publication Date
March 19, 2010
Subject Category
Ground Support Systems And Facilities (Space)
Report/Patent Number
KSC-2010-054
Report Number: KSC-2010-054
Meeting Information
Meeting: Shuttle Processing Overview
Location: Cape Cavernal, FL
Country: United States
Start Date: March 19, 2010
Funding Number(s)
CONTRACT_GRANT: NNJ06VA01C
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available