NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Seven Processes that Enable NASA Software Engineering TechnologiesThis slide presentation reviews seven processes that NASA uses to ensure that software is developed, acquired and maintained as specified in the NPR 7150.2A requirement. The requirement is to ensure that all software be appraised for the Capability Maturity Model Integration (CMMI). The enumerated processes are: (7) Product Integration, (6) Configuration Management, (5) Verification, (4) Software Assurance, (3) Measurement and Analysis, (2) Requirements Management and (1) Planning & Monitoring. Each of these is described and the group(s) that are responsible is described.
Document ID
20110007863
Acquisition Source
Goddard Space Flight Center
Document Type
Presentation
Authors
Housch, Helen
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Godfrey, Sally
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
August 25, 2013
Publication Date
February 1, 2011
Subject Category
Computer Programming And Software
Meeting Information
Meeting: PM Challenge
Location: Long Beach, CA
Country: United States
Start Date: February 9, 2011
End Date: February 10, 2011
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available