Solar Dynamics Observatory Launch and CommissioningThe Solar Dynamics Observatory (SDO) was launched on February 11, 2010. Over the next three months, the spacecraft was raised from its launch orbit into its final geosynchronous orbit and its systems and instruments were tested and calibrated in preparation for its desired ten year science mission studying the Sun. A great deal of activity during this time involved the spacecraft attitude control system (ACS); testing control modes, calibrating sensors and actuators, and using the ACS to help commission the spacecraft instruments and to control the propulsion system as the spacecraft was maneuvered into its final orbit. This paper will discuss the chronology of the SDO launch and commissioning, showing the ACS analysis work performed to diagnose propellant slosh transient and attitude oscillation anomalies that were seen during commissioning, and to determine how to overcome them. The simulations and tests devised to demonstrate correct operation of all onboard ACS modes and the activities in support of instrument calibration will be discussed and the final maneuver plan performed to bring SDO on station will be shown. In addition to detailing these commissioning and anomaly resolution activities, the unique set of tests performed to characterize SDO's on-orbit jitter performance will be discussed.
Document ID
20110008136
Acquisition Source
Goddard Space Flight Center
Document Type
Preprint (Draft being sent to journal)
Authors
O'Donnell, James R., Jr.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Kristin, D.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Bourkland, L.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Hsu, Oscar C.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Liu, Kuo-Chia
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Mason, Paul A. C.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Morgenstern, Wendy M.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Russo, Angela M.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Starin, Scott R.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Vess, Melissa F.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
August 25, 2013
Publication Date
February 4, 2011
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
AAS 11-081
Meeting Information
Meeting: American Astronautical Society Guidance and Control Conference
Location: Breckenridge, CO
Country: United States
Start Date: February 4, 2011
End Date: February 9, 2011