NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Testing Strategies and Methodologies for the Max Launch Abort SystemThe National Aeronautics and Space Administration (NASA) Engineering and Safety Center (NESC) was tasked to develop an alternate, tower-less launch abort system (LAS) as risk mitigation for the Orion Project. The successful pad abort flight demonstration test in July 2009 of the "Max" launch abort system (MLAS) provided data critical to the design of future LASs, while demonstrating the Agency s ability to rapidly design, build and fly full-scale hardware at minimal cost in a "virtual" work environment. Limited funding and an aggressive schedule presented a challenge for testing of the complex MLAS system. The successful pad abort flight demonstration test was attributed to the project s systems engineering and integration process, which included: a concise definition of, and an adherence to, flight test objectives; a solid operational concept; well defined performance requirements, and a test program tailored to reducing the highest flight test risks. The testing ranged from wind tunnel validation of computational fluid dynamic simulations to component ground tests of the highest risk subsystems. This paper provides an overview of the testing/risk management approach and methodologies used to understand and reduce the areas of highest risk - resulting in a successful flight demonstration test.
Document ID
20110008442
Acquisition Source
Langley Research Center
Document Type
Conference Paper
Authors
Schaible, Dawn M.
(NASA Langley Research Center Hampton, VA, United States)
Yuchnovicz, Daniel E.
(NASA Langley Research Center Hampton, VA, United States)
Date Acquired
August 25, 2013
Publication Date
March 29, 2011
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NF1676L-11964
Report Number: NF1676L-11964
Meeting Information
Meeting: 26th Aerospace Testing Seminar
Location: Manhattan Beach, CA
Country: United States
Start Date: March 29, 2011
End Date: March 31, 2011
Funding Number(s)
WBS: WBS 869021.03.07.01.15
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available