NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Lessons Learned for Planning and Estimating Operations Support RequirementsOperations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.
Document ID
20110009880
Acquisition Source
Marshall Space Flight Center
Document Type
Abstract
Authors
Newhouse, Marilyn
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
August 25, 2013
Publication Date
February 9, 2011
Subject Category
Economics And Cost Analysis
Report/Patent Number
M10-0950
Report Number: M10-0950
Meeting Information
Meeting: NASA PM Challenge 2011: "Explore and Inspire"
Location: Long Beach, CA
Country: United States
Start Date: February 9, 2011
End Date: February 10, 2011
Funding Number(s)
CONTRACT_GRANT: NAS8-02060
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available