SOFIA Program SE and I Lessons LearnedOnce a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.
Document ID
20110010897
Acquisition Source
Armstrong Flight Research Center
Document Type
Presentation
Authors
Ray, Ronald J.
(NASA Dryden Flight Research Center Edwards, CA, United States)
Fobel, Laura J.
(NASA Dryden Flight Research Center Edwards, CA, United States)
Brignola, Michael P.
(Science Applications International Corp. United States)
Date Acquired
August 25, 2013
Publication Date
February 9, 2011
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
DFRC-E-DAA-TN2589
Report Number: DFRC-E-DAA-TN2589
Meeting Information
Meeting: NASA PM Challenge
Location: Long Beach, CA
Country: United States
Start Date: February 9, 2011
End Date: February 11, 2011