NEXT Propellant Management System Integration With Multiple Ion ThrustersAs a critical part of the NEXT test validation process, a multiple-string integration test was performed on the NEXT propellant management system and ion thrusters. The objectives of this test were to verify that the PMS is capable of providing stable flow control to multiple thrusters operating over the NEXT system throttling range and to demonstrate to potential users that the NEXT PMS is ready for transition to flight. A test plan was developed for the sub-system integration test for verification of PMS and thruster system performance and functionality requirements. Propellant management system calibrations were checked during the single and multi-thruster testing. The low pressure assembly total flow rates to the thruster(s) were within 1.4 percent of the calibrated support equipment flow rates. The inlet pressures to the main, cathode, and neutralizer ports of Thruster PM1R were measured as the PMS operated in 1-thruster, 2-thruster, and 3-thruster configurations. It was found that the inlet pressures to Thruster PM1R for 2-thruster and 3-thruster operation as well as single thruster operation with the PMS compare very favorably indicating that flow rates to Thruster PM1R were similar in all cases. Characterizations of discharge losses, accelerator grid current, and neutralizer performance were performed as more operating thrusters were added to the PMS. There were no variations in these parameters as thrusters were throttled and single and multiple thruster operations were conducted. The propellant management system power consumption was at a fixed voltage to the DCIU and a fixed thermal throttle temperature of 75 C. The total power consumed by the PMS was 10.0, 17.9, and 25.2 W, respectively, for single, 2-thruster, and 3-thruster operation with the PMS. These sub-system integration tests of the PMS, the DCIU Simulator, and multiple thrusters addressed, in part, the NEXT PMS and propulsion system performance and functionality requirements.
Document ID
20110012903
Acquisition Source
Glenn Research Center
Document Type
Technical Memorandum (TM)
Authors
Sovey, James S.
(Alphaport, Inc. Cleveland, OH, United States)
Soulas, George C.
(NASA Glenn Research Center Cleveland, OH, United States)
Herman, Daniel A.
(NASA Glenn Research Center Cleveland, OH, United States)
Date Acquired
August 25, 2013
Publication Date
May 1, 2011
Subject Category
Spacecraft Propulsion And Power
Report/Patent Number
E-17746
NASA/TM-2011-217040
Report Number: E-17746
Report Number: NASA/TM-2011-217040
Funding Number(s)
WBS: WBS 346.620.04.05.03.13