NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Cryopumping Field Joint Can TestingFor long installations, vacuum jacketed piping often comes in 40 foot sections that are butt welded together in the field. A short can is then welded over the bare pipe connection to allow for insulation to be protected from the environment. Traditionally, the field joint is insulated with multilayer insulation and a vacuum is pulled on the can to minimize heat leak through the bare section and prevent frost from forming on the pipe section. The vacuum jacketed lines for the Ares I mobile launch platform were to be a combined 2000 feet long, with 60+ pipe sections and field joint cans. Historically, Kennedy Space Center has drilled a hole in the long sections to create a common vacuum with the field joint can to minimize maintenance on the vacuum jacketed piping. However, this effort looked at ways to use a passive system that didn't require a vacuum, but may cryopump to create its own vacuum. Various forms of aerogel, multilayer insulations, and combinations thereof were tested to determine the best method of insulating the field joint while minimizing maintenance and thermal losses.
Document ID
20110014010
Acquisition Source
Kennedy Space Center
Document Type
Conference Paper
Authors
Johnson, Wesley L.
(NASA Kennedy Space Center Cocoa Beach, FL, United States)
Fesmire, James E.
(NASA Kennedy Space Center Cocoa Beach, FL, United States)
Meneghelli, Barry E.
(ASRC Aerospace Corp. Cocoa Beach, FL, United States)
Date Acquired
August 25, 2013
Publication Date
June 13, 2011
Subject Category
Fluid Mechanics And Thermodynamics
Report/Patent Number
KSC-2011-109
Report Number: KSC-2011-109
Meeting Information
Meeting: CryOgenic Engineering Conference
Location: Spokane, WA
Country: United States
Start Date: June 13, 2011
End Date: June 17, 2011
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available