NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Swift BAT Loop Heat Pipe #0 Temperature Droop Problem and Solution After Its Primary Heater Controller FailureThe primary heater controller for Burst Alert Telescope (BAT) loop heat pipe (LHP) #0 failed on March 31, 2010. It has been disabled. The secondary heater circuit is operational. However the set point tolerance of the secondary heater controller is significantly out of specifications. A novel variable conductance heat pipe (VCHP) is used to pre-condition the LHP propylene liquid before it returns to the compensation chamber (CC). Due to the limit on the quantity of power switches, the LHP and VCHP temperatures are controlled by different channels of the same heater controller. For this reason, the VCHP heater controller channel is also out of specification. It caused larger tolerances in the temperature of the propylene liquid returning to the CC. As a result, there were intermittent temperature droops every 10-14 days at the coldest attitude during the eclipse. After the set point of the secondary heater controller was gradually increased from 8 C to 8.7 C, there was no temperature droop for over four months.
Document ID
20110015261
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Choi, Michael K.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
August 25, 2013
Publication Date
July 17, 2011
Subject Category
Fluid Mechanics And Thermodynamics
Report/Patent Number
GSFC.CP.4859.2011
Report Number: GSFC.CP.4859.2011
Meeting Information
Meeting: 41st International Conference on Environmental Systems (ICES)
Location: Portland, OR
Country: United States
Start Date: July 17, 2011
End Date: July 21, 2011
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available