NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Ground and Range Operations for a Heavy-Lift Vehicle: Preliminary ThoughtsThis paper discusses the ground and range operations for a Shuttle derived Heavy-Lift Vehicle being launched from the Kennedy Space Center on the Eastern range. Comparisons will be made between the Shuttle and a heavy lift configuration (SLS-ETF MPCV April 2011) by contrasting their subsystems. The analysis will also describe a simulation configuration with the potential to be utilized for heavy lift vehicle processing/range simulation modeling and the development of decision-making systems utilized by the range. In addition, a simple simulation model is used to provide the required critical thinking foundations for this preliminary analysis.
Document ID
20110020273
Acquisition Source
Ames Research Center
Document Type
Conference Paper
Authors
Rabelo, Luis
(University of Central Florida Orlando, FL, United States)
Zhu, Yanshen
(University of Central Florida Orlando, FL, United States)
Compton, Jeppie
(NASA Kennedy Space Center Cocoa Beach, FL, United States)
Bardina, Jorge
(NASA Ames Research Center Moffett Field, CA, United States)
Date Acquired
August 25, 2013
Publication Date
October 18, 2011
Subject Category
Launch Vehicles And Launch Operations
Report/Patent Number
ARC-E-DAA-TN3976
Report Number: ARC-E-DAA-TN3976
Meeting Information
Meeting: SAE 2011 AeroTech Congress and Exhibition
Location: Toulouse
Country: France
Start Date: October 18, 2011
End Date: October 21, 2011
Sponsors: Society of Automotive Engineers, Inc.
Funding Number(s)
WBS: WBS 534723.02.02.01.40
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available