NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
Power Management and Distribution (PMAD) Model Development: Final ReportPower management and distribution (PMAD) models were developed in the early 1990's to model candidate architectures for various Space Exploration Initiative (SEI) missions. They were used to generate "ballpark" component mass estimates to support conceptual PMAD system design studies. The initial set of models was provided to NASA Lewis Research Center (since renamed Glenn Research Center) in 1992. They were developed to estimate the characteristics of power conditioning components predicted to be available in the 2005 timeframe. Early 90's component and device designs and material technologies were projected forward to the 2005 timeframe, and algorithms reflecting those design and material improvements were incorporated into the models to generate mass, volume, and efficiency estimates for circa 2005 components. The models are about ten years old now and NASA GRC requested a review of them to determine if they should be updated to bring them into agreement with current performance projections or to incorporate unforeseen design or technology advances. This report documents the results of this review and the updated power conditioning models and new transmission line models generated to estimate post 2005 PMAD system masses and sizes. This effort continues the expansion and enhancement of a library of PMAD models developed to allow system designers to assess future power system architectures and distribution techniques quickly and consistently.
Document ID
20110023763
Acquisition Source
Glenn Research Center
Document Type
Contractor Report (CR)
Authors
Metcalf, Kenneth J.
(Boeing Co. Canoga Park, CA, United States)
Date Acquired
August 25, 2013
Publication Date
November 1, 2011
Subject Category
Spacecraft Propulsion And Power
Report/Patent Number
E-18023
NASA/CR-2011-217268
Report Number: E-18023
Report Number: NASA/CR-2011-217268
Funding Number(s)
CONTRACT_GRANT: NAS3-01140
WBS: WBS 432938.08
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available